Get it in writing
The sub who started before the scope was agreed
Schedules on a job site are tight, and a good sub who can start Monday is worth more than a signed agreement by Friday. So the sub starts. Three weeks in, the first invoice arrives and the general contractor and the sub discover they had different ideas about what was in the number, when progress payments were due, and whether retainage was being held. Both have been doing the right thing by their own understanding. The agreement is where the two understandings would have met.
What gets decided by default when nothing is signed
When there is no agreement, the terms get decided by whoever is holding the money at the moment of disagreement. The general contractor decides that retainage is ten percent because that is what the prime contract says, and the sub, who quoted without retainage, is short on payroll. The sub decides that the rough-in excluded the fixtures because the quote did, and the general contractor, who read the quote as all-in, has an owner asking why the bathroom has no faucets.
An agreement signed before the first day settles the scope and exclusions, the price basis, the progress payment schedule, retainage, the lien waiver exchange, who pulls permits for the trade, and what the sub's insurance certificate has to show. None of it is complicated. All of it is expensive to argue about later.
The lien waiver exchange, decided up front
The most common source of payment friction between a general contractor and a sub is the lien waiver. The general contractor needs a conditional waiver with each invoice to release the draw; the sub needs to be sure the waiver is conditional on the check clearing. When the exchange is spelled out in the agreement, the invoice and the waiver travel together and nobody is surprised. The agreement template includes that clause and the lien waiver templates match it.
Signing it before Monday without slowing anything down
The reason the agreement waits is that it takes time to produce. From a template it takes a few minutes: the project, the scope, the price, the dates, the retainage percentage and the insurance limits are blanks. Send it to the sub by email or text on Friday, the sub signs on their phone over the weekend and attaches the insurance certificate as a file upload in the same signing session, and the general contractor countersigns. The certified copy with both signatures is in both inboxes before anyone is on site.
When the sub has already started
Sign it now anyway, dated today, with a line that the terms apply to the work already performed on the project as well as the work to come. Agree in writing on what has been done and invoiced so far before signing, so the agreement starts from a shared ledger. It is a less comfortable conversation than it would have been on Friday, and still far easier than the one at the end of the job.
Common questions
- Can a subcontractor agreement be signed electronically?
- Yes. Electronic signatures on contracts are recognized under the federal ESIGN Act and state UETA laws. The sub signs on a phone from a private link and the general contractor countersigns, with signing order if you want it.
- Can the sub attach the insurance certificate while signing?
- Yes. The template has a file upload field. The certificate lands inside the certified PDF so it travels with the agreement instead of in a separate email.
- Who should sign first?
- Either order works. Many general contractors send it to the sub first and countersign after, so the version the sub agreed to is the version that gets signed.
- What if the prime contract has terms that flow down?
- The template has a flow-down clause and a checkbox confirming the sub received the applicable prime contract terms. Attach those pages or send them alongside.
- Does the agreement change my lien rights?
- An agreement sets the terms between the general contractor and the sub. Lien rights and the forms that release them are set by the law of the state where the project is located; the lien waiver templates note where a statutory form is required.
General information, not legal advice. Laws change and their application depends on the specific facts. Consult a licensed attorney in your state about your own documents.