Get it in writing

Progress payments and the lien waiver exchange

A lien waiver is a short document in which a contractor, sub or supplier gives up the right to file a lien on a property for work they have been paid for. The conditional and unconditional versions are the two halves of one exchange that happens at every progress payment, and knowing which to sign when is the difference between getting paid and giving up the one tool that makes sure you do.

Conditional versus unconditional, in one paragraph each

A conditional lien waiver says: when this payment clears, I waive my lien rights for the amount it covers. It is safe to sign before you are paid, because it does nothing until the money arrives. Owners and general contractors ask for it with the invoice so they can release the payment knowing the waiver will take effect.

An unconditional lien waiver says: I have been paid this amount and I waive my lien rights for it, full stop. It is safe to sign only after the check has cleared. Signed before, it gives up the right to lien for money you may never receive.

The exchange at each progress payment

The rhythm is the same on most jobs. The sub sends an invoice for work in place and a conditional waiver for that amount. The general contractor pays. When the payment clears, the sub sends an unconditional waiver for the amount paid. The next invoice comes with the next conditional waiver. At final payment the same two steps happen for the final amount, usually with a final waiver that closes out the whole job.

Written into the subcontractor agreement up front, this exchange runs on its own. Left unwritten, it becomes a phone call at every draw.

Statutory forms in some states

Several states prescribe the exact wording a lien waiver must use for it to have effect, and a few require a specific form by statute. Where that is the case, the statutory form is the one to use and a generic waiver is not a substitute. The templates say so on their pages rather than attempting fifty variants, and the lien waiver clause in the subcontractor agreement defers to the statutory form where one exists.

Signing waivers without the fax machine

A waiver is one page with a few blanks: the project, the parties, the amount, the through date, and a signature. From a template it is sent in a minute to whoever needs to sign it, they sign on a phone, and the certified copy with a verification code goes to both sides. Signing order lets the general contractor's acknowledgment follow the sub's signature when both are needed. Electronic signatures on these documents are recognized under the federal ESIGN Act and state UETA laws; where a state requires notarization of a waiver, follow that requirement.

Common questions

Should I sign an unconditional lien waiver before I am paid?
No. An unconditional waiver gives up lien rights whether or not the money arrives. Sign a conditional waiver with the invoice and the unconditional one after the payment clears.
What is a through date on a lien waiver?
The date up to which the waiver covers work and materials. Work after that date is not waived, so each progress waiver covers the period of that invoice.
Does a waiver cover retainage?
A well-drafted progress waiver excludes retainage, disputed amounts and unpaid change orders, so you waive only what you have actually been paid. The templates say so.
Do suppliers sign lien waivers too?
Yes. Material suppliers and sub-subcontractors have lien rights in most states, and a general contractor often asks the sub to collect waivers from them as well.
Does my state require a specific waiver form?
Some do. Where a statute prescribes the form, use it; a generic waiver may not have effect there. The template pages note this, and a local attorney or your state's statute is the authority.

General information, not legal advice. Laws change and their application depends on the specific facts. Consult a licensed attorney in your state about your own documents.